图片展示
English
  • 中文
  • English
English
  • 中文
  • English
Product Center

Contact Us

图片展示

Jiangsu Chuneng Engineering Technology Co., Ltd. (Headquarters)

Address: No. 93 Taihangshan Road, Suqian High tech Industrial Development Zone, Jiangsu Province

Tel/Fax: 0527-84498789

 

Nanjing Branch

Address: Room 909, Building C5, Greenland Window, No. 5 Jinxiu Street, Yuhua District, Nanjing City

Mobile: 15195866722 Phone/Fax: 025-83371808

Power supply operation and maintenance (the company's own product application project has been shortlisted as a qualified manufacturer for power supply operation and maintenance in Suqian and Xuzhou power supply companies)

product details

1. Inspection of DC power supply system in substations

The operation department regularly arranges operators to regularly inspect the DC power supply equipment and grasp the real-time operation status of the DC power supply system equipment. The inspection of the DC power supply system is divided into daily inspection and special inspection. The content and key items of the inspection vary depending on the type of inspection. Daily inspections mainly include monitoring the operating environment of the DC power supply system, visual inspection, and recording the monitoring voltage and current of the system; The special inspection mainly includes measuring the float charging voltage, float charging current, and DC control bus, closing bus voltage, and current value of the battery pack; Measure the voltage and current values of the charging device and charging module, measure the voltage and internal resistance of a single battery, and measure the operating temperature of the DC power supply system. During the inspection process, attention should be paid to the analysis of daily and special inspection data, and relevant inspection record forms should be formed. Falsification is strictly prohibited, which may cause defects in the DC power system and cause unplanned shutdowns.


2. Maintenance of DC power supply system in substations

The key work of the maintenance project is to regularly carry out maintenance and regular testing and repair work according to the cycle, and inspect equipment such as battery packs, DC screens, feeder screens, charging devices, etc. Firstly, the battery pack should be charged and discharged according to the cycle to check the quality of the battery pack. Especially for battery packs with longer operating years, comprehensive analysis and equipment status evaluation should be conducted, and the battery should be replaced according to the standard, Ensure that the battery pack has sufficient capacity to supply power to the substation system; Secondly, other DC power supply equipment (such as chargers, integrated monitoring modules, feeding equipment, etc.) other than batteries should undergo regular testing and maintenance according to the inspection cycle to check and verify the operational status and reliability of the DC power supply system function, ensure its integrity, and ensure the reliable operation of all equipment in the DC power supply system.


3. Switching operation of DC power supply system in substations

In general, there are two operating modes: the "running" and "out of service" states of the battery pack and charger. The main operations include the operation process of "charging device from running state to disabled state", "disabled state to running state", and the switching operation between "battery pack from running state to disabled state" and "disabled state to running state". It is necessary to be familiar with and master the switching operation process between the four states. The main precautions for switching operation of the DC power supply system include: the main principle is that the feeder load does not lose power, and the battery pack is not allowed to detach from the system in principle; Secondly, for the system switching operation of dual battery packs, it is necessary to confirm that there are no faults in the dual system, especially charger faults, insulation faults, abnormal voltage of a single battery, abnormal bus voltage, AC faults, etc; Ensure that there are no fault signals before conducting the switching operation; There are two modes of operation: with independent busbar connection switch and without independent busbar connection switch. The operating premise is that the two sets of DC power supply systems should be from the same manufacturer, and the switching operation process of the two modes is different, which should be taken seriously by the operating personnel; Finally, for the DC power supply system of a single set of battery packs, a backup battery pack is required for power supply to prevent the DC power supply system from losing power, causing voltage loss in the DC system and affecting the normal operation of the substation secondary equipment. For the operation of DC power supply systems with different wiring methods, it is recommended to revise and update the typical ticket for the operation of the DC power supply system in real time to ensure the correctness of the typical ticket. During operation, typical ticket operations should be cited for review to reduce errors in operation and avoid misoperation and unreasonable operation causing DC power supply system faults or accidents.


Power supply operation and maintenance (the company's own product application project has been shortlisted as a qualified manufacturer for power supply operation and maintenance in Suqian and Xuzhou power supply companies)
Long press to look detail
Long by picture save/share

Chuneng Customer Case

Suqian People

Suqian People's Armed Forces Department 250KVA Box Transformer Project, 2022

Guohua Huanghua 100MW Wind Farm Direct System and Uninterruptible Power Supply Transformation Project, 2021

Guohua Huanghua 100MW Wind Farm Direct System and Uninterruptible Power Supply Transformation Project, 2021

High voltage transformation and distribution system of SMIC Dongfang PS station

High voltage transformation and distribution system of SMIC Dongfang PS station

110KV Beihui of Wuxi Jiangyin Intercity Rail Transit Project

110KV Beihui of Wuxi Jiangyin Intercity Rail Transit Project

South Glass Institute (Suqian) New Materials Co., Ltd. Project

South Glass Institute (Suqian) New Materials Co., Ltd. Project

60KVA UPS Power Supply Project at Nanjing Sports Center, 2021

60KVA UPS Power Supply Project at Nanjing Sports Center, 2021

Rudong Jinhongye Paper Co generation Project

Rudong Jinhongye Paper Co generation Project

Suqian Yunhe Port 110KV Substation

Suqian Yunhe Port 110KV Substation

Suqian Shengji Pharmaceutical Technology Co., Ltd. 10KV Distribution Room Project, 2020

Suqian Shengji Pharmaceutical Technology Co., Ltd. 10KV Distribution Room Project, 2020

Sihong Photovoltaic Power Generation Leading Award Incentive Base Mu Guang Complementary Project

Sihong Photovoltaic Power Generation Leading Award Incentive Base Mu Guang Complementary Project

Jiangsu Chuneng Engineering Technology Co., Ltd

Striving for excellence, collaborative innovation, service-oriented, and win-win development

Copyright © All owned by Chuneng Engineering 


Contact +

Address: No. 93 Taihangshan Road, Suqian High tech Industrial Development Zone, Jiangsu Province

Tel/Fax: 0527-84498789

Nanjing Branch: Room 909, Building C5, Greenland Window, No. 5 Jinxiu Street, Yuhua District, Nanjing City

Mobile: 15195866722 Phone/Fax: 025-83371808

Scan code to follow
  

Jiangsu Chuneng Engineering Technology Co., Ltd

Striving for excellence, collaborative innovation, service-oriented, and win-win development


Contact +

Address: No. 93 Taihangshan Road, High tech Industrial Development Zone, Suqian City

Tel/Fax: 0527-84498789

Nanjing Branch: Room 909, Building C5, Greenland Window, No. 5 Jinxiu Street, Yuhua District, Nanjing City

Mobile: 15195866722 Phone/Fax: 025-83371808

Scan code to follow

  


Copyright © All owned by Chuneng Engineering

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.